Infrastructure
  
 
Your Position :Home >> Infrastructure
 
Infrastructure
 

In today’s Taizhou,the local airport’s flights can reach 15 big domestic cities including Beijing Shanghai, Shenzhen and xi’an etc, and it only takes less than two hour’s ride to Ningbo and Wenzhou Airports. 9routeways have been formed towards the outside on land with the highway network of the expressway and state highway as the main trunk lines. Only taking 2 hours and 4 hours to reach Hangzhou and Shanghai, respectively. The water transportation has also been very convenient with domestic sea routes extend in all directions and regular international container lines at Taizhou Harbor.

Taizhou is an important energy base in East China. Taizhou power plant, as the second major thermal power plant, has a total installation capacity reaching 1.41 million kilowatts.Being the state key project, Tiantai. Tongbo pump and Energy store-up power station has an installation capacity of 1.2 million kilowatts. The sanmen Bay Nuclear power station will be able to reach over 10 million kilowatts of installation capacity.The 2.4-million kilowatts of installation capacity. The 2.4-million-kw unit will be built up at Yunhuan Thermal power plant during the ist phase project.

  
Home   |   Superior industries    Infrastructure   Investment projects   |   Service Department   |  Investment procedure
  
Foreign Trade Department:0576-88225945  Department of foreign capital:0576-88225676  Department of Foreign :0576-88225974
Fax:0576-88881844  Add:Jiaojiang District in Taizhou road construction on the 16th  Zip:318000
Copyright:Taizhou City Foreign Trade and Economic Cooperation Bureau  Technical Support:CBN
浙ICP备05080022号 Show flow